ಅಭಿಪ್ರಾಯ / ಸಲಹೆಗಳು

ಐಪಿಡಿಎಸ್ ಐಟಿ ಹಂತ-೨ ಯೋಜನೆ

IPDS IT PHASE-2 PROJECT

 

  • Ministry of Power, Govt. of India has launched Integrated Power Development Scheme (IPDS) IT enablement Phase –II for the urban areas having population more than 5000. RAPDRP Part-A will get subsumed in this scheme and continued as a separate component of IPDS.
  • 20 Towns in BESCOM and total 124 towns across all ESCOMs in Karnataka are covered under this project.
  • Power Finance Corporation (PFC) is the nodal agency for IPDS IT Enablement.
  • The financial support by GoI to an extent of 60% of approved DPR cost i.e, Rs.37.19 Crs (Approved DPR Cost Rs.61.98 Crs) convertible to grant (Max. 75% if the project is completed within timeline). No revenue expenditure considered in the DPR and need to be borne by Utility
  • The project awarded during March-2020 in different packages as below:

Sl. No

Package

Firm

Awarded Date

1

(a) DC-DRC Hardware and Software refresh across all ESCOMs of Karnataka

M/s. Infinite Computer Solutions

26.03.2020

(b) Replacement of Storage at DC

M/s. Corporate Infotech Pvt Ltd

30.10.2018

(c) Replacement of Router at DC

M/s. Value Point Systems Pvt Ltd

30.03.2020

2

GIS survey

M/s. Cyberswift Infotech Pvt. Ltd

26.03.2020

3

Fixing of Modems

M/s Analogics Pvt. Ltd.

30.03.2020

4

IT Infrastructure

M/s Idea Infinity Pvt. Ltd.

10.09.2020

 

Details of works under the project

1.  Replacement of Data Centre hardware procured under RAPDRP Part-A project and Implementation of 18 software application modules, covering both 98 RAPDRP towns and 124 IPDS towns across all ESCOMs

2.  Hosting Disaster Recovery Centre(DRC) on MEITY Empanelled Cloud

3.  GIS based Asset Mapping, Survey and Digitization and Integration of Consumer Indexing of all ESCOMs.

4.  Supply and fixing Modems to Feeders/ DTCs/Boundary/HT/LT (>40HP) installations in IPDS towns of all ESCOMs.

5.  Supply and installation of IT infrastructure in the IPDS towns of all ESCOMs.

 

Stipulated Timeline by MoP/PFC:

DPR sanction

05.07.2017

Project Completion (24 months from DPR sanction)

04.07.2019

Project Verification and closure (30 months from DPR sanction)

04.01.2020

Project Completion (Extended)

31.12.2021

Project Verification and Closure (Extended)

31.03.2022

 

 

Progress so far:

Sl. No.

Package

Physical progress

1

DC-DRC Hardware and Software refresh across all ESCOMs of Karnataka and Hosting DRC on cloud

 

Hardware: All necessary hardware viz., Servers, Switches, Load Balancer etc., supplied and installation under progress.

 

Software: Necessary software Licenses supplied

 

Application: AS-IS sessions for all modules completed and TO-BE documentation under finalization

2

GIS based Asset Mapping, Survey and Digitization and Integration of Consumer Indexing data

Field Survey status:

 

BESCOM : 15 out of 20 Towns completed

All ESCOMs : 84 out of 124 Towns completed

 

Land Base: 25 out of 124 Towns Satellite images supplied from NRSC till date

3

Fixing of Modems

(excluding BESCOM)

 

Master data is being collected from ESCOMs for the Towns where GIS survey is completed.                                   

 

Inspection carried out in all ESCOMs except CESC

 

DI issued by MESCOM only

4

IT Infrastructure

 

IT Hardware delivered to All ESCOM Stores.

Materials are being drawn from concerned divisional stores and allocated to IPDS towns as per BOM. Installation work is in progress

 

 

 

 

ಇತ್ತೀಚಿನ ನವೀಕರಣ​ : 09-06-2021 06:36 AM ಅನುಮೋದಕರು: Admin


ಹಕ್ಕುತ್ಯಾಗ

ಈ ಪುಟವು ಸರ್ಕಾರಿ ಸಚಿವಾಲಯ/ ಇಲಾಖೆ/ ಸಂಸ್ಥೆಗಳಿಗೂ ಲಿಂಕುಗಳನ್ನು ಕಲ್ಪಿಸುತ್ತದೆ ಎಂಬುದನ್ನು ದಯವಿಟ್ಟು ಗಮನಿಸಿ. ಈ ವೆಬ್ ಸೈಟುಗಳ ವಿಷಯಗಳು ಆಯಾ ಸಂಸ್ಥೆಗಳ ಸ್ವತ್ತೇ ಆಗಿದ್ದು, ಯಾವುದೇ ಹೆಚ್ಚಿನ ಮಾಹಿತಿ ಅಥವಾ ಸಲಹೆಗಾಗಿ ಅವರನ್ನೇ ಸಂಪರ್ಕಿಸುವುದು

ಜಾಲತಾಣ ನೀತಿಗಳು

  • ಹಕ್ಕುಸ್ವಾಮ್ಯ ನೀತಿ
  • ಬಾಹ್ಯಜಾಲತಾಣ ಸಂಪರ್ಕ ನೀತಿ
  • ಭದ್ರತಾ ನೀತಿ
  • ಕರಾರುಗಳು ಮತ್ತು ಷರತ್ತುಗಳು

ಸಂದರ್ಶಕರು

  • ಇತ್ತೀಚಿನ ನವೀಕರಣ​ :
  • ಸಂದರ್ಶಕರು :
  • ಆವೃತ್ತಿ :
ವಿಷಯದ ಮಾಲೀಕತ್ವ ಮತ್ತು ನಿರ್ವಹಣೆ : ಬೆಂಗಳೂರು ವಿದ್ಯುತ್ ಸರಬರಾಜು ಕಂಪನಿ ನಿಯಮಿತ
ವಿನ್ಯಾಸ, ಅಭಿವೃದ್ಧಿ ಮತ್ತು ಪ್ರಕಟಣೆ : ಇ-ಆಡಳಿತ ಕೇಂದ್ರ , ಕರ್ನಾಟಕ ಸರ್ಕಾರ © 2024, ಎಲ್ಲಾ ಹಕ್ಕುಗಳೂ ಕಾಯ್ದಿರಿಸಿವೆ

ಜಾಲತಾಣದ ಉತ್ತಮ ನೋಟಕ್ಕಾಗಿ ಕ್ರೋಮ್‌ v-87.0.4280.141, ಮೈಕ್ರೋಸಾಫ್ಟ್‌ ಎಡ್ಜ್‌ v-87.0.664.75, ಫೈರ್‌ಫಾಕ್ಸ್‌ v-83.0 ಬ್ರೌಸರ್‌ಗಳನ್ನು ಬಳಸಿ. ಸ್ಥಿರಚಿತ್ರಣ : 1280x800 to 1920x1080